参考文献/References:
[1] 贾桂清,谢亚平.富春江电厂泄洪闸门监控系统改造[J].水电自动化与大坝监测,2003(1):63-65,75.
[2] 张友湖,曾强,鲍务均.ANSYS在弧形泄洪闸门三维有限元分析中的应用[J].机电工程技术,2005(10):59-60,68.
[3] 姜树海,范子武.Bayes方法在水工泄洪闸门事故率分析中的运用[J].水利学报,2006(8):945-949.
[4] 宋咏春,陈家权,李文娟.弧形钢闸门的安全性能评估研究[J].现代制造工程,2005(11):53-55.
[5] Mo Y A Multiple-valued decision-diagram-based approach to solve dynamic faulttrees[J]. IEEE Transactions on Reliability,2014,63(1):81-93.
[6] 郑逸,张乐锋.基于自适应加权模糊Petri网的电网故障诊断研究[J].电气开关,2016,54(3):68-72.
[7] 周如旗,陈忆群.基于扩展模糊Petri网的知识推理方法研究[J].计算机科学,2016,43(3):75-79.
[8] Mostafa M D, Rahim N A. Solving non-convex economic dispatch problem via backtracking search algorithm[J]. Energy,2014,77:372-381.
[9] Xu Q, Guo L, Na W, et al. Opposition-based backtracking search algorithm for numerical optimization problems[C]// International Conference on Intelligent Science & Big Data Engineering, 2015.
[10] 方致远,向衍.弧形钢闸门三维有限元优化分析[J].水电能源科学,2017,35(7):182-185.
[11] 徐国宾,高仕赵,訾娟.淤泥对平面钢闸门启门力影响的计算方法[J].水利学报,2012,43(9):1092-1096.